How we did it
Phase 1: Consulting
Viegand Maagøe advised Letbek on which EPD type, which PCR and which program operator they should use to prepare the EPD for the product “OC Frame system”, to cover the specific needs for documentation.
Phase 2: Preparation
Since it is a requirement to model most of the life cycle in EPDs according to EN15804+A2, the entire production process at Letbek was mapped. After this, the processes that needed to be modeled in order to calculate the environmental impacts could be identified and the collection of relevant production data started. This also included mapping subcontractors, and a scenario was determined for the end-of-life of the product based on the most likely waste management of the OC frame system.
Phase 3: Calculation and documentation
The LCA was calculated and everything was documented in an LCA report. The choice of EPD program operator fell on IBU, where the EPD was created and sent for verification together with the LCA report.